Visualisation

Healthcare

Modular medical outpatient units

Modular outpatient units are a complete answer to primary healthcare provision under time pressure. Turnkey delivery takes around 50 working days, which makes it possible to close gaps in medical infrastructure in new districts or during the modernisation of existing facilities.

01 Advantages

What the modular solution delivers

  • 01 Full compliance with safety codes
  • 02 30–40% lower capital cost
  • 03 Relocatable: can be dismantled and moved
  • 04 Turnkey delivery in 2–3 months
  • 05 Considered layouts and daylighting
  • 06 Comfortable operating conditions
02 Engineering services

The building arrives with services installed

Engineering systems are installed at the plant; on site only the connection to external networks remains.

  • Water supply
  • Sewerage
  • Heating
  • Ventilation
  • Power supply
  • Fire suppression
  • Security and low-voltage systems
05 Discuss a project

Request a costing

The form opens a pre-filled message in your email client. If that is inconvenient, call us or write directly.

Discuss a project

Tell us about the task, we will prepare a costing

We will clarify the building purpose, area, region and schedule, then come back with a preliminary costing and layout.