For the public sector
Social and departmental infrastructure delivered with state expert review, full as-built documentation and a confirmed right to work under construction contracts.
- 01
Confirmed right to carry out works
Moscow Builders Union: a self-regulating construction association (MSS Association), member since 30.05.2019. Liability level two: contract value per single agreement, up to RUB 500,000,000.
- 02
The design passes state expert review
Our in-house design office takes the documentation through to a positive conclusion. Site investigation and the architectural, structural, electrical, plumbing, HVAC and fire-alarm packages sit in one scope of responsibility.
- 03
Standards and as-built documentation
Products comply with GOST, TU and SNiP. On handover we provide the building passport, copies of material and equipment certificates, the detailed design packages and electrical test records.
- 04
Social and departmental infrastructure
The portfolio includes teaching blocks, departmental canteens, administrative complexes and modular settlements. The company has worked with law-enforcement agencies and social development bodies.
Sectors for the public sector
- 01
Industry
Facilities for oil and gas, mining, power generation and utilities: shift camps, boiler houses, treatment plants, checkpoints and fire stations.
Read more - 03
Education
Schools, kindergartens, teaching blocks, libraries and community centres, planned around the teaching process and compliant with daylighting, acoustic and fire safety requirements.
Read more - 04
Healthcare
Rural health posts, outpatient units, clinics, laboratories, sanitary checkpoints and veterinary stations, with finishes and zoning designed for sanitary requirements.
Read more - 06
Sport
Sports halls, fitness and wellness centres, swimming pools, martial arts halls and changing rooms with specialist flooring, lighting and ventilation.
Read more
Comparable facilities
Education Modular school in Tsiyab-Tsilitli, Dagestan
- Region
- Republic of Dagestan, Gumbetovsky District
- Total area
- 1,475 m²
- Construction time
- 60 days
- Year completed
- 2026
Education Modular school in Adilyotar, Dagestan
- Region
- Republic of Dagestan, Khasavyurtovsky District
- Total area
- 1,475 m²
- Year completed
- 2026
Education Modular teaching block for a college
- Region
- Central Russia
- Total area
- 350 m²
- Manufacturing time
- 90 days
- Year completed
- 2024
Tell us about the task, we will prepare a costing
We will clarify the building purpose, area, region and schedule, then come back with a preliminary costing and layout.
