Modular shopping centre
A modular shopping centre is assembled from standard sections, so galleries can be reconfigured, retail blocks added and the food court extended as the scheme develops. The building can be dismantled and moved if the urban context changes.
What the modular solution delivers
- 01 Full compliance with safety codes
- 02 30–40% lower capital cost
- 03 Relocatable: can be dismantled and moved
- 04 Turnkey delivery in 2–3 months
- 05 Considered layouts and daylighting
- 06 Comfortable operating conditions
The building arrives with services installed
Engineering systems are installed at the plant; on site only the connection to external networks remains.
- Water supply
- Sewerage
- Heating
- Ventilation
- Power supply
- Fire suppression
- Security and low-voltage systems
Request a costing
More in this section–Retail
Discuss a project
Tell us about the task, we will prepare a costing
We will clarify the building purpose, area, region and schedule, then come back with a preliminary costing and layout.
