Modular kindergarten
Realise your own educational concept (Montessori, bilingual or early-development) in a building made for it. A modular kindergarten is delivered turnkey with a bespoke layout, considered interior design and specialist equipment, on a timescale comparable to refitting rented premises.
What the modular solution delivers
- 01 Full compliance with safety codes
- 02 30–40% lower capital cost
- 03 Relocatable: can be dismantled and moved
- 04 Turnkey delivery in 2–3 months
- 05 Considered layouts and daylighting
- 06 Comfortable operating conditions
The building arrives with services installed
Engineering systems are installed at the plant; on site only the connection to external networks remains.
- Water supply
- Sewerage
- Heating
- Ventilation
- Power supply
- Fire suppression
- Security and low-voltage systems
Scope and specification
01 Project delivery speed
- Exceptionally short construction time
- just five months from design to commissioning
- Fast installation
- the main structure is assembled in 2–3 weeks
- Speed of delivery
- the shortage of pre-school places
02 Cost efficiency
- Significant cost savings
- compared with permanent construction
- Reduced costs
- on building operation
- Cost optimisation
- on utilities
03 Quality and safety
- Factory production
- of modules under strict quality control
- Use of environmentally safe materials
- meeting sanitary standards
- Complete fit-out
- all required permits and approvals
04 Functionality and comfort
- Multiple design options
- for any number of children
- Considered layout
- meeting all pre-school facility requirements
- Modern systems
- ventilation, heating and air conditioning
05 Flexibility
- Expansion option
- by adding new modules
- Structural mobility
- if relocation is required
- Design adaptability
- to the client's specific requirements
06 Architectural options
- Range of colour options
- in the external finish
- Contemporary design
- of internal spaces
- Considered ergonomics
- of the space
07 Infrastructure benefits
- Construction options
- in any setting, including new residential districts
- Minimal requirements
- for site preparation
- No significant volumes of
- of construction waste during installation
08 Room fit-out
- Play areas
- with modern equipment
- Sleeping quarters
- with the necessary infrastructure
- Canteen
- fully equipped
- Rooms
- for personnel
- Sanitary facilities
- designed around children's needs
- Sports
- and music rooms
Request a costing
More in this section–Education
Tell us about the task, we will prepare a costing
We will clarify the building purpose, area, region and schedule, then come back with a preliminary costing and layout.
