Photo: Modular teaching block for a college

Education

Modular teaching block

A modular teaching block is the way to extend an existing institution or create a new campus quickly. The layout is built around the teaching process, classrooms and lecture rooms, laboratories, circulation and break-out areas, administrative and technical spaces, with daylighting, acoustic and fire safety requirements met in full.

01 Advantages

What the modular solution delivers

  • 01 Full compliance with safety codes
  • 02 30–40% lower capital cost
  • 03 Relocatable: can be dismantled and moved
  • 04 Turnkey delivery in 2–3 months
  • 05 Considered layouts and daylighting
  • 06 Comfortable operating conditions
02 Engineering services

The building arrives with services installed

Engineering systems are installed at the plant; on site only the connection to external networks remains.

  • Water supply
  • Sewerage
  • Heating
  • Ventilation
  • Power supply
  • Fire suppression
  • Security and low-voltage systems
03 Scope and specification

Scope and specification

01 Fields of application
Administrative buildings
Production areas
Retail facilities
Social facilities
Temporary structures of various types
02 Structural features
Frame reliability
from steel profiles
High-quality materials
of walls and roof (sandwich panels)
Sound insulation
of internal spaces
Sealed joints
between modules
03 Functional capabilities
Layout flexibility
with reconfigurable layout
Structural mobility
can be dismantled and relocated
Versatile application
for various purposes
Built-in engineering systems
electrical, heating, ventilation
04 Environmental performance
Use of
safe materials
Energy-saving
technology
Application options
alternative energy sources
Minimal waste
during construction
06 Discuss a project

Request a costing

The form opens a pre-filled message in your email client. If that is inconvenient, call us or write directly.

Discuss a project

Tell us about the task, we will prepare a costing

We will clarify the building purpose, area, region and schedule, then come back with a preliminary costing and layout.