Shift camp in Tyumen
A self-contained complex with fully installed engineering systems, handed over after commissioning.
- Facility type
- Shift camp
- Region
- Tyumen Region, Russia
- Year completed
- 2017
About the project
Complete construction of a shift camp in the Tyumen region. A tight schedule and quality requirements determined the choice of block-modular technology.
The company took responsibility for the full project cycle: site investigation, design documentation that passed state expert review, module manufacturing, logistics and on-site construction works.
Facility specification
- Warranty period
- 24 months
- Design service life
- 20 years