Visualisation

Sport

Modular swimming pool

Add the most sought-after facility to your project. A modular pool creates a modern, safe and attractive aquatic zone that significantly raises the commercial and investment appeal of a sports centre, hotel, residence or private club. We deliver the project turnkey, from pool tank design and equipment selection to installation and commissioning.

01 Advantages

What the modular solution delivers

  • 01 Full compliance with safety codes
  • 02 30–40% lower capital cost
  • 03 Relocatable: can be dismantled and moved
  • 04 Turnkey delivery in 2–3 months
  • 05 Герметичность: современные системы гидроизоляции
  • 06 Considered layouts and daylighting
  • 07 Comfortable operating conditions
02 Engineering services

The building arrives with services installed

Engineering systems are installed at the plant; on site only the connection to external networks remains.

  • Water supply
  • Sewerage
  • Heating
  • Ventilation
  • Power supply
  • Fire suppression
  • Security and low-voltage systems
03 Scope and specification

Scope and specification

01 The pool building comprises
Sports zone
Administration and amenity section
02 Functional purpose
Sports services
training and competitions
Wellness programmes
physical fitness and wellness activities
Swimming instruction
training for children from age 10 and adults
Recreational functions
rest and leisure provision
03 Main zones include
Sports zone
Main pool hall, Preparation room, Gym
Administrative zone
Staff rooms, Corridors and service areas
Technical zone
Plant rooms, Heating and ventilation systems, Water treatment
Support zone
Entrance area, Cloakroom, Changing rooms with showers, First-aid room, Catering areas
04 Technical features
Structural frame
arched modular elements
Materials
certified steel structures with anti-corrosion coating
Safety
fire alarm and fire suppression systems
Energy efficiency
modern water treatment systems
05 Structural advantages
Air-tightness
modern waterproofing systems
Installation speed
2–3 months, turnkey
Mobility
can be dismantled and relocated
Cost efficiency
30–40% cost reduction
Safety
compliance with all building codes
06 Operating characteristics
Water treatment systems
fully automated processes
Climate control
optimal temperature maintained
Safety
compliance with GOST and SP standards
Durability
use of quality materials
07 Additional options
Scalability
the complex can be extended
Upgrading
equipment upgrades
Adaptability
reconfiguration of rooms
Environmental performance
use of safe materials
08 Fields of application
Sports complexes
Wellness centres
Private estates
Temporary facilities
Educational institutions
05 Discuss a project

Request a costing

The form opens a pre-filled message in your email client. If that is inconvenient, call us or write directly.

Discuss a project

Tell us about the task, we will prepare a costing

We will clarify the building purpose, area, region and schedule, then come back with a preliminary costing and layout.